- A new DISCMAM use case shows how metal additive manufacturing can transform the production of obsolete spare parts, reducing lead times from weeks to hours through digital manufacturing and quality assessment.
Within the DISCMAM European Defence Fund project, coordinated by LORTEK, the Danish Technologial Institute (DTI) worked with the Belgian Ministry of Defence on a replacement solution for a compressor cover for a Mercedes-Benz Unimog U1300L / 435 series. This vehicle platform dates back to the late 1970s/1980s, meaning many units still in operation are now around 40 years old or more. The compressor cover is an obsolete cast aluminium spare part that can fail due to leakage at the joint. The challenge was not only to reproduce the part, but to make it suitable for fast, on-site oriented production where access to machining, post-processing equipment and testing facilities may be limited.
At the Industrial 3D Print, in the Danish Technological Institute, the part was:
- 3D scanned and digitally reconstructed.
- Adapted for PBF-LB metal 3D printing.
- Produced in AlSi10Mg.
- Optimized to reduce support structures by approx. 30%.
- Printed without supports or machining in critical functional areas.
- Supported by digital quality ranking using in-situ process data.
An important part of the work was the development of a digital quality assessment approach. Using PCA-based statistical analysis of in-situ Euler data, it is now possible to detect part outliers and rank printed components according to their expected usability. A PCA-based quality map enables rapid digital ranking of printed parts, supporting replacement decisions when physical testing is limited. Based on the level of urgency and the quality indicators, parts can be classified for permanent replacement, temporary replacement, emergency use, or finally rejected as scrap. This provides a valuable decision-support tool in situations where physical testing facilities are limited or unavailable.
The result is a production route where the part can be printed in approximatry 8 hours when aiming for a permanent replacement. For temporary or emergency replacement scenarios, the route can be further accelerated, depending on the required quality level and urgency. This is a significant improvement compared to a traditional supplier lead time of approximately 2 weeks. This case shows how additive manufacturing can help reduce downtime, restore access to obsolete spare parts and enable faster maintenance operations closer to where the need occurs.